Local Law 11 Facade Inspections: What NYC Building Owners and Buyers Need to Know

Local Law 11, now called the Facade Inspection and Safety Program, requires NYC buildings taller than six stories to have their exterior walls inspected on a set cycle and to fix unsafe conditions on a strict clock. For owners and buyers, the real exposure is the repair bill, the sidewalk shed, and the assessment.

This guide from Sean Brewer and Elina Brewer of The Brewer Team at Compass explains what the law requires, where the current deadlines stand, how the penalties work, what changed for sidewalk sheds in 2026, and what to check before buying or selling in a covered building in Downtown Manhattan or Brooklyn.

What is Local Law 11, and which buildings does it cover?

Local Law 11 is the common name for the city's Facade Inspection and Safety Program, or FISP. It began as Local Law 10 of 1980, after falling masonry killed a student in 1979, and was expanded in 1998 to reach all facades, not only those facing the street. The Department of Buildings (DOB) enforces it through rule 1 RCNY 103-04.

The rule applies to buildings greater than six stories, regardless of what the certificate of occupancy says. A building with six stories above grade plus a cellar can also be covered if more than half of the cellar's height at any exterior wall sits above the adjacent ground. A 12-story prewar co-op in the West Village or Brooklyn Heights is covered. DOB publishes a map of covered facades, but owners are responsible for confirming whether a building is subject to the rule.

Does Local Law 11 apply to Brooklyn townhouses?

Generally not, if the house is six stories or fewer, but a separate rule may. Since January 1, 2024, DOB has required an annual observation of any parapet facing the public right-of-way, regardless of building height. Detached one- and two-family homes are exempt, as are buildings with a fence or barrier that prevents access to the exterior wall.

That means an attached townhouse in Park Slope, Fort Greene, or Cobble Hill with a street-facing parapet can fall under the parapet rule even though FISP does not apply. A competent person, such as a mason, architect, or engineer, can perform the observation. Reports must be kept for at least six years, and unsafe conditions must be corrected within 90 days of notifying DOB.

How often are facade inspections required, and is that changing?

DOB's published guidance and rule state that inspections and technical reports are due every five years. A DOB-approved Qualified Exterior Wall Inspector (QEWI), who must be a New York-licensed professional engineer or registered architect, performs the examination and files through DOB NOW: Safety.

Change is in motion. Local Law 49 of 2025 lets the inspection interval run between six and twelve years starting October 1, 2026. In March 2026, the city proposed extending the standard cycle to six years, with hands-on inspections every 12 years for lower-risk, well-maintained buildings. As of this post, DOB's pages still describe a five-year cycle, and engineers report that the five-year filing schedule remains for Cycle 10. Treat the current filing window as the working rule until DOB publishes otherwise, and confirm the status with the building's inspector.

When is the Cycle 10 filing deadline for my building?

The deadline depends on the last digit of the building's block number:

Blocks ending in 4, 5, 6, or 9: February 21, 2025 to February 21, 2027

Blocks ending in 0, 7, or 8: February 21, 2026 to February 21, 2028

Blocks ending in 1, 2, or 3: February 21, 2027 to February 21, 2029

The first window is the urgent one. A building on a block ending in 5 with no acceptable report by February 21, 2027 starts accruing penalties immediately after that date.

What do Safe, SWARMP, and Unsafe mean on a FISP report?

The inspector assigns one of three classifications. Safe means no repair is needed and the facade will not become unsafe within five years. SWARMP, short for Safe with a Repair and Maintenance Program, means the facade is safe now but needs work within one to five years, and the inspector sets the completion date. The same conditions cannot be reported as SWARMP in consecutive cycles. Unsafe means a condition hazardous to people or property.

Unsafe is not rare. Habitat Magazine reported in August 2026 that 13.3 percent of filings in the latest cycle were classified unsafe, up from under 1 percent about two decades earlier, with engineers attributing much of the rise to stricter DOB review. A classification is a reason to ask about the repair plan, not a verdict on the building by itself.

What happens when a facade is classified Unsafe?

The owner must immediately install public protection, such as a sidewalk shed, fence, or netting, under DOB permits. Unsafe conditions must be repaired within 90 days of filing the technical report. If that is not possible, the QEWI files an extension request.

Once repairs are done, the owner must file an amended report within two weeks. Protection stays up until DOB approves an amended Safe or SWARMP report or a partial shed removal. Civil penalties begin 90 days after the initial unsafe report is filed, unless an acceptable extension covers the period.

What are the penalties for missing a Local Law 11 filing or repair?

Filing a report costs $425, and an extension of time to complete repairs costs $305. The penalties are larger. Late filing is $1,000 per month, and failure to file is $5,000 per year. A building 12 months past its window with no report owes $12,000 plus $5,000, or $17,000.

An uncorrected SWARMP condition carries a $2,000 penalty. Failing to correct an unsafe condition costs $1,000 per month, plus a per-foot shed charge starting in the second year: $10, $20, $30, and $40 per linear foot per month in years two through five. On a 100-foot shed in year three, that is $1,000 plus $2,000, or $3,000 a month and $36,000 a year.

How did the 2026 sidewalk shed rules change the timeline?

Shed permits issued or renewed on or after January 26, 2026 expire every 90 days and no longer renew automatically. A DOB rule implementing Local Laws 48 and 51 of 2025 took effect on August 13, 2026.

Local Law 51 sets milestones counted from the initial shed permit: construction documents within five months, permit applications within eight months, and completed repairs within two years. Missing them carries penalties of $5,000 to $20,000. Local Law 48 adds per-foot penalties when work is not in progress, starting at $10 per linear foot per month for sheds up less than three years and reaching $200 at four years or more. The Mayor's Office says penalties begin after 180 days, can be paused for meaningful repair progress, and are expected to start in early 2027. At $10, a 100-foot shed costs $1,000 a month.

For a board, that leaves less room to keep a shed up while it sorts out financing.

Who pays for facade repairs in a co-op or condo?

The owners do, one way or another. The board typically chooses between a loan and a special assessment. Cooperator News reports that some buildings face a hit of "$750,000 or even $1 million," more than many reserves can cover, with staging among the most expensive parts of the job.

Assessments are generally allocated by shares in a co-op and by percentage of common interest in a condo, and owners typically pay within one to three years. Here is the math. If a $1,000,000 project is funded entirely by assessment, an apartment with a 2 percent share pays $20,000. Over 36 months, that is about $556 a month on top of maintenance or common charges.

Repairs can also affect how you use the home. Habitat reported a case where a top-floor shareholder lost use of a terrace for more than a year, and any compensation depends on the proprietary lease and the board.

What should buyers and sellers check before a deal in a FISP building?

Buyers should start with these items:

The conditions certificate, which must be posted in the lobby or vestibule and show the facade's most recent condition

The latest FISP report, its classification, and any SWARMP completion date

Facade violations, searchable by address on the DOB NOW Public Portal

The building's filing window, and whether the inspector has been hired

Several years of board minutes, for capital projects and structural issues

Audited financials, for reserves and upcoming assessments

The age of any shed permit, and whether repairs are moving

If the building is in a historic district in SoHo, Tribeca, or Brooklyn Heights, landmark approvals can add time. Have your attorney address who pays any assessment announced between contract and closing, since unexpected assessments can justify renegotiating.

Sellers benefit from gathering the same documents before listing. A buyer's attorney will ask for them, and answers ready on day one keep a facade question from becoming a late-stage surprise.

Work With The Brewer Team

A facade report tells you what a building is about to spend. Reading it well is part of pricing the home correctly, whether you are buying or selling.

The Brewer Team at Compass, led by Sean Brewer and Elina Brewer, brings 30 combined years of experience, $400M+ sold, and 2,500 transactions across Downtown Manhattan and Brooklyn, along with 1,000+ rental units at 95% occupancy. To see how building diligence fits into a purchase, start with our Buyer's Guide.

Frequently Asked Questions

What is the difference between Local Law 11 and FISP?

They refer to the same program. Local Law 11 of 1998 is the name most New Yorkers still use, and the Facade Inspection and Safety Program is the name the Department of Buildings uses today.

How long does an owner have to repair an unsafe facade in NYC?

Unsafe conditions must be repaired within 90 days of filing the technical report. If repairs cannot be finished in that time, the inspector files an extension request. Civil penalties begin at 90 days unless an acceptable extension covers the period.

Are Local Law 11 inspections still required every five years?

DOB's published rule and guidance still describe a five-year cycle. Local Law 49 of 2025 allows an interval of six to twelve years starting October 1, 2026, and the city proposed six years in March 2026, so confirm the current status with a QEWI.

How can a buyer find out if a building has facade problems?

Check the conditions certificate in the lobby, search facade violations on the DOB NOW Public Portal, and ask for the latest FISP report. Then review board minutes and audited financials for planned repairs and assessments.